- November 11, 2025Install vegetated swale and barriers along Parkers Point Blvd; convert road to walking trail to prevent ORV erosion.
- November 11, 2025Install bioretention basin along Maple Street, restore eroded beach area, and replant trees for erosion control and habitat.
- November 11, 2025Install articulated concrete block mat with rip-rap edges to stabilize ORV crossing across the North Branch Forked River.
- November 11, 2025Rehabilitate buried and clogged outfalls along the north side of the Lacey Lakes; add rip-rap and infiltration features.
- November 11, 2025Reforest and restore disturbed land areas within the Toms River State Forest to stabilize soils, control erosion, and reduce sediment…