- November 11, 2025Install articulated concrete block mat with rip-rap edges to stabilize ORV crossing across the North Branch Forked River.
- November 11, 2025Retrofit Ravine Pond with sedimentation forebay, permeable weir, and splash pad to limit erosion into Deer Head Lake.
- November 11, 2025Install neighborhood-scale GSI north and south of Deer Head Lake to limit stormwater and nutrient loading.
- November 11, 2025Implement distributed green stormwater infrastructure in neighborhoods with direct stormwater discharges to lakes.
- November 11, 2025Rehabilitate buried and clogged outfalls along the north side of the Lacey Lakes; add rip-rap and infiltration features.